Corridor E Studies
Location Four, north-south segments starting at I-35 north of Jarrell and ending at US 79 through Precincts 3 and 4.
Description

The county is conducting the Corridor E Planning & ROW Preservation Study as part of a planned ultimate controlled-access roadway in the central part of the county as an alternative north/south transportation corridor to IH 35. This study is made up of four segments that are a part of the county’s Long-Range Transportation Plan. All four segment studies were funded via the voter-approved 2019 Road Bond; however, there is no right-of-way or construction funding identified for any of the segments at this time. This study will serve as an important planning step to accommodate current and anticipated traffic levels to provide reliable transportation as the county continues to grow. By planning ahead, the County can best coordinate with property owners, businesses, and the community. 

 
Corridor E2 Planning & ROW Preservation Study
Location Between US 79 and Chandler Rd
Project Limits and Length From US 79 to Chandler Rd, approximately 3.6 miles long
Status The engineer, BGE, Inc., is working on the study and schematic design of the Corridor, which is anticipated to be complete in fall 2022. 
 
Corridor E3 Planning & ROW Preservation Study
Location Between Chandler Rd and future SH 29
Project Limits and Length From Chandler Rd to future SH 29, approximately 4 miles long
Status The engineer, BGE, Inc., is working on the study and schematic design of the Corridor, which is anticipated to be complete in fall 2022. 
 
Corridor E4 Planning & ROW Preservation Study
Location

Location: Between future SH 29 and Ronald Reagan Extension/Corridor D

Project Limits and Length From future SH 29 to Ronald Reagan Extension/Corridor D, approximately 5.5 miles long
Status The engineer, Halff & Associates, is working on the study and schematic design of the Corridor, which is anticipated to be complete in fall 2022. 
 
Corridor E5 Planning & ROW Preservation Study
Location Between CR 305 and CR 330
Project Limits and Length From CR 305 at IH 35 to CR 330, approximately 9 miles long
Status The engineer, American Structure Point, is currently evaluating a few additional alignment options to minimize impacts to homes and businesses based on feedback from property owners. A final alignment is anticipated to be completed by early 2023.

 
Project Map

Corridor Es Graphic Map Updated